林道秋月線 from Hiroshima

Cat 4Asphalt compare.addToCompare

700 m ·14.7% média· 101m de desnível · Altitude máx 114m · Índice FIETS 1450

Hiroshima, Japan

Cycle the 林道秋月線 from Hiroshima (Cat 4). Starting from Hiroshima, This 0.7km climb averages 14.7% gradient reaching 113m elevation. Surface: asphalt.

Cume

Pico
仏ノ塔 (205m)

Superfície

Asphalt100%

Tipos de estrada

Unclassified50%
Secondary25%
Residential25%

Estradas

299
Todos os nomes de estradas (2)
  • 林道秋月線
  • 秋月飛渡瀬線
Carregando mapa...
Carregando perfil...