5.2 km ·5.5% povprečno· 284m vzpona · Maksimalna višina 584m · FIETS indeks 1548
Nabari, Japan
Cycle the 布生夏見線 (694) (Cat 3). Starting from Nabari, This 5.2km climb averages 5.5% gradient reaching 584m elevation. Surface: paved.
Površina
Paved100%
Tipi cest
Residential75%
Secondary25%
Ceste
694
Lokacija
SpotCode- Start
- Nabari, Nabari, Japanke·ni|he·fi|mu·ha|lo·no Google Maps Street View
- Cilj
- Nara-shi, Nabari, Japanke·ni|he·fi|le·ha|di·ta Google Maps Street View
Nalaganje zemljevida...
Nalaganje profila...
climb.nearby.title
climb.nearby.viewAllClimb near Nara-shi
2.0 km at 27.2%
↑ 531mCat 2
国道166号 (166)
800 m at 24.4%
↑ 188mCat 3
Climb near Osaka
360 m at 22.9%
↑ 80mUncat
Climb near Higashiosaka
480 m at 22.5%
↑ 105mCat 4
三郎岳
1.0 km at 20.5%
↑ 207mCat 3
Climb near Tsu
430 m at 20.4%
↑ 85mUncat
Climb near Nara-shi
400 m at 20.1%
↑ 79mUncat
国道422号 (422)
500 m at 20.1%
↑ 97mCat 4Paved
Climb near Osaka
610 m at 20.0%
↑ 119mCat 4
Climb near Nara-shi
930 m at 19.5%
↑ 178mCat 3
国道368号 (368;369;422)
2.4 km at 19.4%
↑ 455mCat 2
Climb near Osaka
760 m at 19.1%
↑ 141mCat 4