Madya-Pahadi (Puspalal) highway (NH03)

HCPaved compare.addToCompare

8.4 km ·12.7% snitt· 1026m stigning · Max höjd 2118m · FIETS-index 12594

Birendranagar, NEPAL

Cycle the Madya-Pahadi (Puspalal) highway (NH03) (HC). Starting from Birendranagar, This 8.4km climb averages 12.7% gradient reaching 2118m elevation. Surface: paved.

Topp

Närliggande POI:er

Yta

Paved50%
Ground50%

Vägtyper

Unclassified75%
Secondary25%

Vägar

NH03
Start
Birendranagar, Bhagawatimai, NEPAL
ka·he|la·ti|si·no|ta·ta Google Maps Street View
Mål
Birendranagar, Bhagawatimai, NEPAL
ka·he|la·ti|tu·he|ma·me Google Maps Street View
Laddar karta...
Laddar profil...