12.6 km ·ort. 4.8%· 605m tırmanış · Maks. Yükseklik 793m · FIETS Endeksi 2912
Takasaki, Japan
Cycle the 安中榛名湖線 (211) (Cat 2). Starting from Takasaki, This 12.6km climb averages 4.8% gradient reaching 793m elevation. Surface: asphalt.
Zemin
Asphalt100%
Yol Tipleri
Primary50%
Secondary25%
Unclassified19%
Tertiary6%
Yollar
Birincil:林道南榛名山線
21129122154
Tüm yol isimleri (6)
- 安中榛名湖線
- 林道南榛名山線
- 昭和橋
- あら町下室田線
- 八本松松井田線
- 新井下室田線
Konum
SpotCode- Başlangıç
- Takasaki, Takasaki, Japanke·no|li·ka|fa·ko|ho·no Google Maps Street View
- Bitiş
- Takasaki, Takasaki, Japanke·no|li·ki|do·ko|ke·ti Google Maps Street View
Özellikler
Köprü
Harita yükleniyor...
Profil yükleniyor...
climb.nearby.title
climb.nearby.viewAllTırmanış #5727190
470 m at 34.6%
↑ 153mCat 4
白倉林道 from Takasaki
840 m at 24.8%
↑ 202mCat 3
Tırmanış #4200721
800 m at 23.6%
↑ 180mCat 3
Tırmanış #6064081
420 m at 22.6%
↑ 93mCat 4
Tırmanış #6398579
360 m at 21.3%
↑ 74mUncat
Tırmanış #4658556
690 m at 20.4%
↑ 137mCat 4
西上州やまびこ街道 (254)
900 m at 17.7%
↑ 155mCat 4
Tırmanış #5784347
460 m at 17.5%
↑ 78mUncat
Tırmanış #5595809
500 m at 17.0%
↑ 84mUncatPaved
Climb near Takasaki
930 m at 16.9%
↑ 154mCat 4
Tırmanış #6380446
360 m at 16.7%
↑ 59mUncat
Tırmanış #4726655
670 m at 16.4%
↑ 108mCat 4