Madya-Pahadi (Puspalal) highway (NH03)

HCPaved compare.addToCompare

8.4 km ·平均12.7%· 1026m爬升 · 最高海拔 2118m · FIETS指数 12594

Birendranagar, NEPAL

Cycle the Madya-Pahadi (Puspalal) highway (NH03) (HC). Starting from Birendranagar, This 8.4km climb averages 12.7% gradient reaching 2118m elevation. Surface: paved.

顶点

附近POI

路面

Paved50%
Ground50%

道路类型

Unclassified75%
Secondary25%

道路

NH03
起点
Birendranagar, Bhagawatimai, NEPAL
ka·he|la·ti|si·no|ta·ta Google Maps Street View
终点
Birendranagar, Bhagawatimai, NEPAL
ka·he|la·ti|tu·he|ma·me Google Maps Street View
加载地图中...
加载配置中...