3.5 km ·7.5% media· 266m de desnivel · Altitud máx 337m · Índice FIETS 1989
Hiroshima, Japan
Cycle the 南方竹原線 (369) (Cat 3). Starting from Hiroshima, This 3.5km climb averages 7.5% gradient reaching 336m elevation. Surface: asphalt.
Superficie
Asphalt100%
Tipos de carretera
Residential33%
Trunk17%
Tertiary17%
Secondary17%
Unclassified17%
Carreteras
3692
Todos los nombres de carreteras (2)
- 国道2号
- 南方竹原線
Ubicación
SpotCode- Inicio
- Hiroshima, Mihara, Japanke·ni|pi·hi|re·mi|lo·re Google Maps Street View
- Final
- Hiroshima, Takehara, Japanke·ni|pi·hi|mu·ko|ta·ti Google Maps Street View
Cargando mapa...
Cargando perfil...
climb.nearby.title
climb.nearby.viewAllClimb near Fukuyama
490 m at 25.4%
↑ 120mCat 4
Climb near Hiroshima
470 m at 25.3%
↑ 114mCat 4
県道大島環状線 (Ooshimakanjo Sen) (49)
480 m at 25.1%
↑ 118mCat 4
Climb near Mihara
350 m at 25.0%
↑ 85mUncat
しまなみ海道サイクリングロード from Imabari
350 m at 23.5%
↑ 79mUncat
Climb near Hiroshima
420 m at 21.9%
↑ 90mCat 4
Climb near Hiroshima
390 m at 21.6%
↑ 82mUncat
東広島向原線 (80)
430 m at 19.7%
↑ 83mUncat
上瀧山農道(うえみち) from Fukuyama
520 m at 19.2%
↑ 99mCat 4Asphalt
Climb near Imabari
600 m at 18.9%
↑ 111mCat 4
県道大島環状線 (Ooshimakanjo Sen) (49)
370 m at 18.7%
↑ 67mUncat
Climb near Hiroshima
610 m at 18.7%
↑ 111mCat 4