도원세교로 from Cheongju-si

Cat 4Concrete compare.addToCompare

3.3 km ·3.5% media· 116m de desnivel · Altitud máx 192m · Índice FIETS 408

Cheongju-si, Republic of Korea

Cycle the 도원세교로 from Cheongju-si (Cat 4). Starting from Cheongju-si, This 3.3km climb averages 3.5% gradient reaching 191m elevation. Surface: concrete.

Cima

Pico
상당산 (491m)
Puerto
이티재
POIs cercanos

Superficie

Concrete100%

Tipos de carretera

Unclassified43%
Track29%
Residential29%

Carreteras

Todos los nombres de carreteras (2)
  • 덕암1길
  • 도원세교로

Ubicación

SpotCode
Inicio
Cheongju-si, Naesu-eup, Republic of Korea
fe·se|ra·sa|ni·ho|si·ri Google Maps Street View
Final
Cheongju-si, Naesu-eup, Republic of Korea
fe·se|re·sa|ri·le|po·ku Google Maps Street View
Cargando mapa...
Cargando perfil...