1.3 km ·11.5% moy· 143m de dénivelé · Altitude max 255m · Indice FIETS 1612
Hamamatsu, Japan
Cycle the 施業道タチバナ線 from Hamamatsu (Cat 4). Starting from Hamamatsu, This 1.3km climb averages 11.5% gradient reaching 255m elevation.
Sommet
- Pic
- 鐘掛岩 (224m)
Types de route
Residential100%
Routes
Localisation
SpotCode- Départ
- Hamamatsu, Iwata, Japanke·ni|mu·li|he·pe|fu·ma Google Maps Street View
- Arrivée
- Hamamatsu, Iwata, Japanke·ni|mu·li|fo·po|ti·li Google Maps Street View
Chargement de la carte...
Chargement du profil...
climb.nearby.title
climb.nearby.viewAll水窪森線 (389)
360 m at 33.3%
↑ 110mCat 4
Climb near Hamamatsu
1.8 km at 32.3%
↑ 531mCat 2
金谷峠
340 m at 26.3%
↑ 87mUncat
京丸林道 from Shizuoka
1.5 km at 25.4%
↑ 350mCat 2Ground
京丸林道 from Shizuoka
2.8 km at 24.3%
↑ 642mCat 1Unpaved
掛川川根線 (39)
630 m at 23.2%
↑ 142mCat 4
Climb near Shizuoka
400 m at 22.9%
↑ 90mCat 4
国道151号 (151)
610 m at 22.7%
↑ 134mCat 4
Climb near Hamamatsu
330 m at 21.4%
↑ 68mUncat
蕎麦粒山
2.3 km at 21.3%
↑ 465mCat 2Concrete
Climb near Shizuoka
820 m at 21.1%
↑ 168mCat 3
Climb near Hamamatsu
1.1 km at 20.9%
↑ 227mCat 3