730 m ·16.3% moy· 117m de dénivelé · Altitude max 249m · Indice FIETS 1867
Himeji, Japan
Cycle the 播磨自動車道 (E29) (Cat 4). Starting from Himeji, This 0.7km climb averages 16.3% gradient reaching 248m elevation. Surface: asphalt.
Sommet
- Pic
- 国見山 (465m)
Surface
Asphalt100%
Types de route
Track50%
Primary50%
Routes
Principale :播磨自動車道
44E29
Tous les noms de routes (2)
- 相生宍粟線
- 播磨自動車道
Localisation
SpotCode- Départ
- Himeji, Shiso, Japanke·no|di·lu|lu·lo|fe·he Google Maps Street View
- Arrivée
- Himeji, Shiso, Japanke·no|di·lu|ma·mo|ri·to Google Maps Street View
Caractéristiques
Tunnel
Chargement de la carte...
Chargement du profil...
climb.nearby.title
climb.nearby.viewAll林道千町・段ヶ峰線 from Himeji
700 m at 27.5%
↑ 185mCat 3
Climb near Tottori-shi
990 m at 27.2%
↑ 258mCat 3
Climb near Himeji
660 m at 26.6%
↑ 167mCat 3
林道千町・段ヶ峰線 from Himeji
680 m at 26.5%
↑ 173mCat 3
Climb near Himeji
350 m at 24.8%
↑ 84mUncat
国道429号 (429)
1.2 km at 24.7%
↑ 273mCat 3Asphalt
国道429号 (429)
1.2 km at 24.7%
↑ 272mCat 3
Climb near Himeji
340 m at 23.6%
↑ 79mUncat
Climb near Himeji
1.3 km at 22.9%
↑ 287mCat 3
Climb near Himeji
490 m at 22.7%
↑ 109mCat 4
Climb near Tottori-shi
840 m at 22.3%
↑ 180mCat 3
相生宍粟線 (44)
1.1 km at 22.3%
↑ 244mCat 3Unpaved