Madya-Pahadi (Puspalal) highway (NH03)

HCPaved compare.addToCompare

8.4 km ·12.7% rata-rata· Pendakian 1026m · Ketinggian Maks 2118m · Indeks FIETS 12594

Birendranagar, NEPAL

Cycle the Madya-Pahadi (Puspalal) highway (NH03) (HC). Starting from Birendranagar, This 8.4km climb averages 12.7% gradient reaching 2118m elevation. Surface: paved.

Puncak

POI Terdekat

Permukaan

Paved50%
Ground50%

Tipe Jalan

Unclassified75%
Secondary25%

Jalan

NH03
Mulai
Birendranagar, Bhagawatimai, NEPAL
ka·he|la·ti|si·no|ta·ta Google Maps Street View
Selesai
Birendranagar, Bhagawatimai, NEPAL
ka·he|la·ti|tu·he|ma·me Google Maps Street View
Memuat peta...
Memuat profil...